Survey Projects
Eagleton
Engineering offers a highly experienced, multidisciplined department providing
all aspects of survey for pipeline, telecommunications, aerial control, boundary
and topographic projects. Our equipment incorporates the latest advances in software,
GPS, wireless, internet and mobile equipment. Combining all of the above with a
solid foundation in traditional survey techniques allows Eagleton to
bring value to their clients.
Right-of-Way Services
Representative Survey Projects
Air Products & Chemicals
Route selection, surveys, preparation of 1300 property plats, 700 permits for a
165 mile, 17 inch diameter in Texas and Louisiana.
Texas & Louisiana
Oxy Chemicals
Route survey, property plats, permits for 14 mile pipeline in Deer Park Texas.
Texas
TEPPCO
Route selection, easement verification, construction and as-built surveys of a 68
mile project for three 12-inch parallel pipelines. Work included locating alternatives
and final route through the congested areas of Port Arthur and Mont Belvieu.
Texas
Lavaca Pipe Line Co.
Preliminary route selection and easement/permit surveys for a 45 mile 12-inch
pipeline project from Mont Belvieu to Texas City. Route included multiple water
crossings including the Houston Ship Channel and placement through congested pipeline
and power line corridors.
Texas
Himont USA, Inc.
Preliminary design, construction, and as-built survey of approximately 26 miles
of 8-inch pipeline located within existing pipeline corridors including the heavily
congested corridors of the Houston Ship Channel area. This survey also included
survey across the Houston Ship Channel and Crystal Bay.
Texas
Coastal Oil & Gas Corp.
Various surveys including boundary, route selection, location, topographic,
and cross-country for the Javelina Project. This project consisted of the survey
for 17 lines ranging in size from 3-inch to 30-inch in the extremely congested refinery
areas of Corpus Christi. It also consisted of a 6-inch line crossing I-37 to Robstown
and a 6-inch line crossing the Corpus Christi Ship Channel and Nueces Bay to Ingleside,
Texas
Transpetco
Route selection, construction, and as-built survey for approximately 120 miles
of 8-inch carbon dioxide pipeline. The project originated in New Mexico, traversed
the Texas Panhandle, and terminated in the Oklahoma Panhandle near the Oklahoma-Kansas
border.
New Mexico Texas, & Oklahoma
Petro Source Carbon Company
Preliminary, construction, and as-built survey for approximately 82 miles of
10-inch carbon dioxide pipeline. The project traversed the West Texas counties of
Terrell, Pecos, Crockett, and Upton. The project was accomplished utilizing a combination
of conventional, total station, and GPS surveying methods.
Texas
Burlington Northern/Santa Fe
Utility survey in highly congested pipeline corridors for a new rail line. Thirteen
mile route included passage through petrochemical plants. Static control and RTK
GPS was utilized.
Texas
Occidental Petroleum
Route selection, preliminary survey, construction staking and as-built survey
of 12 mile CO2 production and injection piping utilizing both conventional and GPS
equipment. Data transferred via electronic files for processing and mapping.
Texas
Other representative clients:
Union Texas Petroleum, Intercontinental Terminals
Company, Dow Chemical Company, Chevron Pipe Line Company, TransAmerican Natural
Gas, Air Products and Chemicals, Tenngasco, General Electric, Chemical Research
and Licensing, Diamond Shamrock, Mobil Producing, CITGO, Amerada Hess Corp., Warren
Petroleum, Gulf Coast Waste, CenterPoint Energy, Plains All American, Longhorn Pipeline
Partners and Texas A&M University.
|